https://xbrl.org/2026/transition-plan#InGeneralPurposeFinancialReports https://xbrl.org/2026/transition-plan#Scope1 https://xbrl.org/2026/transition-plan#Scope2 https://xbrl.org/2026/transition-plan#MediumTerm https://xbrl.org/2026/transition-plan#Absolute xbrli:pure iso4217:NOK utr:tCO2e utr:tCO2e iso4217:NOK TRNOILGASNO000002001 2025-01-01 2025-12-31 TRNOILGASNO000002001 2025-01-01 2025-12-31 transition-og:Midstream asset-emissions-nordhavet NORDHAVET TRNOILGASNO000002001 2025-01-01 2025-12-31 transition-og:Downstream ccs-proportion-downstream TRNOILGASNO000002001 2026-01-01 2030-12-31 TRNOILGASNO000002001 2025-01-01 2025-12-31 transition:GHG TGT-OG-01 TRNOILGASNO000002001 2025-01-01 2025-12-31 transition:Category11

Fjordvik Energi ASA

Transition Plan

Gas, pipelines and a lower-emission future

2025

Cover image

Document Information

Entity Name
Fjordvik Energi ASA
Entity Identifier
TRNOILGASNO000002001
Entity Identifier Scheme
http://standards.iso.org/iso/17442
Report currency
NOK
Report period
2025-01-01 – 2025-12-31
Decimal separator
. (FULL STOP)
Report generated
2023-10-09 00:00:00 +0000

All disclosures are related to the reporting period above unless specified otherwise.

Introduction

This plan sets out how Fjordvik Energi will reduce upstream emissions intensity by 2035. It follows the Disclosure Framework. Fjordvik Energi ASA is a fictional company and every figure in this report is synthetic.

Table of contents

  1. 0 Document and entity information
  2. 1 Foundations
  3. 1.2, 2.2, 4.3 Oil & Gas metrics
  4. 2 Implementation Strategy
  5. 4.1, 4.2, 4.3 Metrics
  6. 4.1, 4.2, 4.3 Targets
  7. 4.3 GHG emissions and removals
  8. 5 Governance

0 Document and entity information ⮌

Fjordvik Energi ASA
Name of reporting entity The name of the entity whose transition plan this is. The entity's machine-readable identity is carried by the report's entity identifier, not by this concept; this exists so a standalone transition plan is attributable on its face, and it must agree with the identifier.
In the general purpose financial reports
Transition plan reporting location Where these transition plan disclosures sit: within the entity's general purpose financial reports, in a standalone document alongside them, or in a standalone document that the general purpose financial reports cross-refer to. A single-value extensible enumeration.
2026-04-21
Transition plan publication date The date this version of the transition plan was published.

1 Foundations ⮌

By 2035 we will reduce upstream emissions from 410,000 tCO2e to 287,000 tCO2e. Progress is 18.5%.

  1. Power platforms from the grid.
  2. Cut methane.
  3. Scale capture.
Strategic Ambition The entity's overarching aims: its objectives and priorities for responding and contributing to the transition to a low-GHG, climate-resilient economy.
Up to the end of 2028, the period of our current business plan and budget.
Short-term definition How the entity defines short-term in the context of transition planning (DF 1.1.e). The Taskforce recommends short-term is defined as no longer than three years (DF footnote 24); an entity defining it as longer should explain why.
From 2029 to the end of 2035, the period covered by our field development and asset life plans.
Medium-term definition How the entity defines medium-term in the context of transition planning (DF 1.1.e).
Beyond 2035, up to the year of our long-term ambition.
Long-term definition How the entity defines long-term in the context of transition planning (DF 1.1.e).

We produce offshore gas and oil and operate a gas export hub. The Nordhavet hub is the centre of our midstream business.

SegmentMetric
Downstream processing6.5% of gross emissions captured and stored
Business model and value chain Current and anticipated implications of the Strategic Ambition on the entity's business model and value chain, and the timeframe over which changes are expected to occur.

We assume that gas stays in demand in Europe through the 2030s, that Norwegian carbon taxes keep rising as legislated, and that the grid has enough low-carbon power to supply the platforms.

We depend on the grid operator for connection of the platforms, on third-party capture and storage capacity and on the supply of electric equipment; we identified these by listing every project's external dependencies and ranking them by cost of delay.

Key assumptions and external factors Key assumptions made and the external factors on which the entity depends to achieve the Strategic Ambition (matters such as policy and regulation, the decarbonisation of the economy, technology, data, demand, levels of warming, the physical impacts of the changing climate, and the effectiveness and limits of adaptation), their implications for achieving it, the timeframes over which they are expected to occur, and whether and how they are reflected in the financial statements.

1.2, 2.2, 4.3 Oil & Gas metrics ⮌

By Asset identifier and Oil & Gas value chain segment and Metric identifier

2025
NORDHAVET / Midstream / asset-emissions-nordhavet
Asset description Nordhavet gas processing and export hub

By Oil & Gas value chain segment and Metric identifier

2025
%
Downstream / ccs-proportion-downstream
Proportion of gross GHG emissions captured and stored 6.5

2 Implementation Strategy ⮌

We plan NOK 9.4 billion of capital expenditure for the transition plan over the five years 2026 to 2030, 23.0% of our planned capital expenditure over the same period, and NOK 610 million for research and development of climate solutions. We fund the plan from operating cash flow, with transition projects approved by the board in the annual capital plan and supported by the tax system's treatment of investment. We expect electrification to lower carbon tax costs, and we do not quantify further effects because gas prices dominate our results.

Financial planning Effects of the transition plan on the entity's financial position, financial performance, cash flows and resourcing.
kr 9,400,000,000
Planned capital expenditure for the transition plan Capital expenditure the entity plans in order to implement its transition plan, over the period of the fact (the planning horizon it states).
Reporting period: 2026-01-01 – 2030-12-31
23.00 %
Planned capital expenditure for the transition plan, as a share of total planned capital expenditure The planned capital expenditure for the transition plan as a proportion of all capital expenditure the entity plans over the same period.
Reporting period: 2026-01-01 – 2030-12-31
kr 610,000,000
Planned investment in research and development for climate solutions Investment the entity plans in research and development for climate solutions as part of its transition plan, over the period of the fact.
Reporting period: 2026-01-01 – 2030-12-31

4.1, 4.2, 4.3 Metrics ⮌

By Asset identifier and Oil & Gas value chain segment and Metric identifier

2025
NORDHAVET / Midstream / asset-emissions-nordhavet
tCO2e
Metric description Asset-level operated emissions, Nordhavet hub
Metric value, governance, business and operational 96,000.00
Metric unit description, governance, business and operational tCO2e, operational control boundary

By Oil & Gas value chain segment and Metric identifier

2025
Downstream / ccs-proportion-downstream
Metric description Share of gross emissions captured and stored, downstream processing

4.1, 4.2, 4.3 Targets ⮌

By Target Category and Target Identifier

2025
GHG / TGT-OG-01
Target metric, description Absolute upstream Scope 1 and 2 emissions
Target objective

To cut absolute upstream Scope 1 and 2 emissions by 30%, from 410,000 tCO2e at 2025 to 287,000 tCO2e by 2035. It is a mitigation target on gross emissions, for which we do not claim 1.5C alignment.

Target scope, description

Upstream operations we control, including the Nordhavet gas export hub, for Scope 1 and Scope 2 together; downstream processing and Scope 3 are outside the target.

GHG scopes covered by target Scope 1
Scope 2
Target period end date 2035-12-31
Time horizon Medium term
Target base period date 2025-12-31
Target milestone, description

Interim milestone: no more than 348,000 tCO2e by 2030, a 15% reduction from 2025, on a straight-line path to the 2035 target of 287,000 tCO2e.

Target type Absolute
Target base value, GHG 410,000 tCO2e
Performance against target, GHG 387,245 tCO2e
GHG emissions intensity per monetary unit 0.0199 tCO2e per kr
Percentage of target achieved 18.50 %
Target informed by the latest international climate agreement NO
International climate agreement, description The Paris Agreement informed our choice to set a target and its year, and we checked the target against the Nationally Determined Contribution of Norway, but we do not claim that it is aligned to a 1.5C pathway: we judge a faster fall in operated emissions is not achievable while we keep producing at current rates.
Target validated by a third party YES
Target review process, description

The Board Sustainability Committee reviews progress quarterly and reviews the target itself once a year, when the annual report is approved. We re-baseline a target if acquisitions, disposals or changes in method move the base by more than 5%. The target and its methodology have been validated by a third party, the Science Based Targets initiative.

Performance trend, description

The measure stood at 387,245 tCO2e at the end of the period against 410,000 tCO2e at the base date, which is 18.5% of the way to the 2035 target. Progress came from powering one platform from the grid and a methane leak detection programme.

Target value, GHG 287,000 tCO2e
Target progress monitoring metrics, description

We monitor Scope 1 and 2 emissions in tCO2e on an operated basis, flaring and venting volumes, and the share of gross emissions captured and stored, reported to the committee each quarter. Progress is expressed as the share of the way from the base to the target, which stands at 18.5%.

4.3 GHG emissions and removals ⮌

388,000 tCO2e
Absolute gross GHG emissions, Scope 1 Absolute gross Scope 1 GHG emissions generated during the reporting period, expressed as metric tonnes of CO2 equivalent. Measured in accordance with the Greenhouse Gas Protocol: A Corporate Accounting and Reporting Standard (2004) unless a jurisdictional authority or exchange requires a different method.
22,000 tCO2e
Absolute gross GHG emissions, Scope 2 Absolute gross Scope 2 GHG emissions generated during the reporting period, expressed as metric tonnes of CO2 equivalent. Where the location-based or market-based measurement basis is specifically required, use the separately named concepts instead.

We measure Scope 1, 2 and 3 emissions under the GHG Protocol Corporate Standard (2004) and its Scope 3 Standard, setting the boundary by operational control. All seven Kyoto gases are included and converted to CO2e using IPCC AR6 100-year global warming potentials. Methane and flaring emissions are measured directly where we have survey data and estimated from engineering factors otherwise. Emission factors come from Norwegian Environment Agency emission factors, the EU Emissions Trading System monitoring plans and direct measurement of methane. We made no change to the approach in the reporting period.

GHG measurement approach, description The measurement approach, inputs and assumptions used to measure GHG emissions, the reason for choosing them, and any changes made during the reporting period with the reasons for those changes. It states the standard used: the GHG Protocol Corporate Standard (2004), or the method a jurisdictional authority or exchange requires instead (4.3.l.ii).

By Scope 3 Category

2025
tCO2e
Scope 3 Category 11
Absolute gross GHG emissions, Scope 3 14,800,000

5 Governance ⮌

The Board Sustainability Committee oversees the transition plan. It approves the targets, meets quarterly to review progress against them, and reports to the full board, which considers climate when it approves strategy, major investments and risk appetite, including field development sanction, acquisitions and the use of the internal carbon price. The committee weighs the trade-off between near-term returns and the targets, and takes independent advice on scenarios and on its own training needs.

Board oversight and reporting The governance body or bodies, or individual or individuals, responsible for oversight of the transition plan.

The Chief Executive is accountable to the Board Sustainability Committee for delivering the plan and chairs the Emissions Programme Board, which brings together Production, Processing, Engineering and Finance. Emissions and target data go through the same controls as our financial reporting, are reviewed by internal audit each year and are reported to the Board Sustainability Committee quarterly. Managers' climate objectives are part of their annual performance reviews.

Roles, responsibility and accountability Management's role in the governance processes, controls and procedures used to monitor, manage and oversee the transition plan.

11.0% of executive remuneration is linked to transition plan metrics, through a 20.0% weighting in the incentive plan. The measures are progress on upstream emissions, power from the grid for platforms and methane leak detection. The remuneration committee sets the measures each year and checks them against reviewed data before any award is made.

Incentives and remuneration How incentive and remuneration structures align with the Strategic Ambition.
20.00 %
Percentage weighting of transition plan metrics in the executive incentive plan The typical percentage weighting of the transition plan-related metric(s) within the incentive plan for the executive population (DF 5.4.a.iii).
11.00 %
Percentage of executive remuneration linked to transition plan metrics The percentage of total executive remuneration that is linked to transition plan-related metric(s) (DF 5.4.a.iv).