All disclosures are related to the reporting period above unless specified otherwise.
We will halve Scope 1 and 2 emissions from operated assets by 2050: from 5,200,000 tCO2e to 2,600,000 tCO2e. Progress so far is 9.7%.
We assume that oil and gas demand declines more slowly than in a 1.5C-consistent scenario, which is one reason our target is not aligned to a 1.5C pathway. We assume Mexican regulators keep requiring flaring reductions and that the carbon price we apply is a fair indication of future costs.
We depend on pipeline and compression capacity to bring associated gas ashore, on the supply of electrification equipment and on regulatory consent for upstream capture and storage; we assessed each by asking project teams for decision dates and testing a two-year delay.
| 2025 | |
|---|---|
| CAMPECHE-ALFA / Upstream / OG-ASSET-CAMPECHE-ALFA | |
| Asset description |
|
| 2025 | |
|---|---|
| % | |
| Upstream / OG-CCS-UPSTREAM | |
| Proportion of gross GHG emissions captured and stored |
|
We operate the Campeche Alfa offshore platform.
We plan MXN 24 billion of capital expenditure for the transition plan over the five years 2026 to 2030, 12.0% of our planned capital expenditure over the same period, and MXN 720 million for research and development of climate solutions. We fund the plan from operating cash flow, with transition projects competing for capital at the internal carbon price. We expect lower operating costs from reduced flaring and higher near-term capital costs; we do not quantify further effects because commodity prices and the exchange rate dominate our results.
| 2025 | |
|---|---|
| CAMPECHE-ALFA / Upstream / OG-ASSET-CAMPECHE-ALFA | |
| tCO2e | |
| Metric description |
|
| Metric value, governance, business and operational |
|
| Metric unit description, governance, business and operational |
|
| 2025 | |
|---|---|
| Upstream / OG-CCS-UPSTREAM | |
| Metric description |
|
| 2025 | |
|---|---|
| GHG / TGT-OG-01 | |
| Target metric, description |
|
| Target objective |
To cut absolute Scope 1 and 2 emissions from operated assets by 50%, from 5,200,000 tCO2e at 2025 to 2,600,000 tCO2e by 2050. It is a mitigation target on gross emissions, for which we do not claim 1.5C alignment. |
| Target scope, description |
Assets we operate, including the Campeche Alfa offshore platform, for Scopes 1 and 2 on an operated basis; assets operated by others are outside the target. |
| GHG scopes covered by target | |
| Target period end date |
|
| Time horizon | |
| Target base period date |
|
| Target milestone, description |
Interim milestone: no more than 3,950,000 tCO2e by 2037, a 24% reduction from 2025, on a straight-line path to the 2050 target of 2,600,000 tCO2e. |
| Target type | |
| Target base value, GHG |
|
| Performance against target, GHG |
|
| GHG emissions intensity per monetary unit |
|
| Percentage of target achieved |
|
| Target informed by the latest international climate agreement |
|
| International climate agreement, description |
|
| Target validated by a third party |
|
| Target review process, description |
The Board Sustainability and Safety Committee reviews progress quarterly and reviews the target itself once a year, when the annual report is approved. We re-baseline a target if acquisitions, disposals or changes in method move the base by more than 5%. The target and its methodology have been validated by a third party, the Science Based Targets initiative. |
| Performance trend, description |
The measure stood at 4,947,800 tCO2e at the end of the period against 5,200,000 tCO2e at the base date, which is 9.7% of the way to the 2050 target. Progress came from reduced flaring and venting on the Campeche Alfa platform. |
| Target value, GHG |
|
| Target progress monitoring metrics, description |
We monitor Scope 1 and 2 emissions in tCO2e on an operated basis, flaring and venting volumes, and the share of gross emissions captured and stored, reported to the committee each quarter. Progress is expressed as the share of the way from the base to the target, which stands at 9.7%. |
Every field development and acquisition is screened at an internal carbon price of MXN 1,400 per tonne of CO2e, rising to MXN 2,300 by 2030; a project that fails at that price does not go to the board.
We measure Scope 1, 2 and 3 emissions under the GHG Protocol Corporate Standard (2004) and its Scope 3 Standard, setting the boundary by operational control. All seven Kyoto gases are included and converted to CO2e using IPCC AR6 100-year global warming potentials. Methane and flaring emissions are measured directly where we have survey data and estimated from engineering factors otherwise. Emission factors come from Mexican national emission factors, the national emissions registry methods and direct measurement at flares and vents. We made no change to the approach in the reporting period.
| 2025 | |
|---|---|
| tCO2e | |
| Consolidated accounting group | |
| Absolute gross GHG emissions, Scope 1 |
|
| 2025 | |
|---|---|
| tCO2e | |
| Scope 3 Category 11 | |
| Absolute gross GHG emissions, Scope 3 |
|
The Board Sustainability and Safety Committee oversees the transition plan. It approves the targets, meets quarterly to review progress against them, and reports to the full board, which considers climate when it approves strategy, major investments and risk appetite, including field development sanction, acquisitions and the use of the internal carbon price. The committee weighs the trade-off between near-term returns and the targets, and takes independent advice on scenarios and on its own training needs.
The Chief Operating Officer is accountable to the Board Sustainability and Safety Committee for delivering the plan and chairs the Emissions Reduction Steering Group, which brings together Production, Engineering, Projects and Finance. Emissions and target data go through the same controls as our financial reporting, are reviewed by internal audit each year and are reported to the Board Sustainability and Safety Committee quarterly. Managers' climate objectives are part of their annual performance reviews.
13.0% of executive remuneration is linked to transition plan metrics, through a 23.0% weighting in the incentive plan. The measures are progress on operated Scope 1 and 2 emissions, flaring and venting volumes and the delivery of capture and storage milestones. The remuneration committee sets the measures each year and checks them against reviewed data before any award is made.