All disclosures are related to the reporting period above unless specified otherwise.
We will reduce Scope 1 emissions from 310,000 tCO2e to 217,000 tCO2e by 2033. Progress is 9.6%.
We assume that grid supply in Ghana stays unreliable enough that diesel remains our back-up, that solar and battery costs keep falling, and that the fuel price does not fall far enough to remove the saving from replacing diesel.
Our plan depends on grid reliability and fuel supply: we depend on the national grid for connection of the hybrid plant and on fuel imports, and we identified these by reviewing each site's energy sources and testing the plan against a prolonged supply shortage.
We plan GHS 1.8 billion of capital expenditure for the transition plan over the five years 2026 to 2030, 21.0% of our planned capital expenditure over the same period, and GHS 38 million for research and development of climate solutions. We fund the plan from operating cash flow, with the solar and battery hybrid financed partly by an equipment supplier. We expect diesel savings to repay the investment within about six years; other effects on cash flow are not quantified because the gold price dominates our results.
| 2025 | |
|---|---|
| gold / production-ore-processed | |
| t | |
| Metric description |
|
| Metric value, governance, business and operational |
|
| Metric unit description, governance, business and operational |
|
| 2025 | |
|---|---|
| Own energy use / self-generated-renewables-own-use | |
| % | |
| Metric description |
|
| Metric value, percentage |
|
| 2025 | |
|---|---|
| GHG / TGT-MM-01 | |
| Target metric, description |
|
| Target objective |
To cut absolute Scope 1 emissions from mining operations by 30%, from 310,000 tCO2e at 2025 to 217,000 tCO2e by 2033. It is a mitigation target on gross emissions, for which we do not claim 1.5C alignment. |
| Target scope, description |
The mining operations we control, including the main gold mine and its processing plant, for Scope 1 only; Scope 2 and Scope 3 are reported but are outside the target. |
| GHG scopes covered by target | |
| Target period end date |
|
| Time horizon | |
| Target base period date |
|
| Target milestone, description |
Interim milestone: no more than 264,000 tCO2e by 2029, a 15% reduction from 2025, on a straight-line path to the 2033 target of 217,000 tCO2e. |
| Target type | |
| Target base value, GHG |
|
| Performance against target, GHG |
|
| GHG emissions intensity per monetary unit |
|
| Percentage of target achieved |
|
| Target informed by the latest international climate agreement |
|
| International climate agreement, description |
|
| Target validated by a third party |
|
| Target review process, description |
The Board Sustainability Committee reviews progress quarterly and reviews the target itself once a year, when the annual report is approved. We re-baseline a target if acquisitions, disposals or changes in method move the base by more than 5%. The target and its methodology have been validated by a third party, the Science Based Targets initiative. |
| Performance trend, description |
The measure stood at 301,072 tCO2e at the end of the period against 310,000 tCO2e at the base date, which is 9.6% of the way to the 2033 target. Progress came from the first phase of the solar and battery hybrid at the main mine. |
| Target value, GHG |
|
| Target progress monitoring metrics, description |
We monitor Scope 1 and 2 emissions in tCO2e from fuel records and metered electricity at each site, diesel use per tonne moved, and the share of renewable electricity used on site, reported to the committee each quarter. Progress is expressed as the share of the way from the base to the target, which stands at 9.6%. |
We measure Scope 1, 2 and 3 emissions under the GHG Protocol Corporate Standard (2004) and its Scope 3 Standard, setting the boundary by operational control. All seven Kyoto gases are included and converted to CO2e using IPCC AR6 100-year global warming potentials. Fuel, explosives and electricity use are taken from site records and metering. Emission factors come from Ghana Energy Commission grid factors, fuel records and metered electricity at each site. We made no change to the approach in the reporting period.
| 2025 | |
|---|---|
| tCO2e | |
| Consolidated accounting group | |
| Absolute gross GHG emissions, Scope 1 |
|
| 2025 | |
|---|---|
| tCO2e | |
| Scope 3 Category 1 | |
| Absolute gross GHG emissions, Scope 3 |
|
The Board Sustainability Committee oversees the transition plan. It approves the targets, meets quarterly to review progress against them, and reports to the full board, which considers climate when it approves strategy, major investments and risk appetite, including capital allocation between mines and the pace of run-down of our coal output. The committee weighs the trade-off between near-term returns and the targets, and takes independent advice on scenarios and on its own training needs.
The Chief Executive is accountable to the Board Sustainability Committee for delivering the plan and chairs the Mine Energy Transition Group, which brings together Operations, Engineering, Procurement and Finance. Emissions and target data go through the same controls as our financial reporting, are reviewed by internal audit each year and are reported to the Board Sustainability Committee quarterly. Managers' climate objectives are part of their annual performance reviews.
7.0% of executive remuneration is linked to transition plan metrics, through a 13.0% weighting in the incentive plan. The measures are progress on Scope 1 emissions, the share of on-site renewable electricity and the replacement of diesel generation. The remuneration committee sets the measures each year and checks them against reviewed data before any award is made.