https://xbrl.org/2026/transition-plan#CrossReferencedFromGeneralPurposeFinancialReports https://xbrl.org/2026/transition-plan#ShortTerm https://xbrl.org/2026/transition-plan#Absolute iso4217:KES xbrli:pure utr:m3 utr:tCO2e TRNFOODBEVERAGEKE001 2025-01-01 2025-12-31 TRNFOODBEVERAGEKE001 2025-01-01 2025-12-31 water-withdrawal-stressed-basins KE-RIFT-VALLEY TRNFOODBEVERAGEKE001 2026-01-01 2030-12-31 TRNFOODBEVERAGEKE001 2025-01-01 2025-12-31 transition:GovernanceEngagementBusinessOperational TGT-FB-01 TRNFOODBEVERAGEKE001 2025-01-01 2025-12-31 transition:ConsolidatedGroup TRNFOODBEVERAGEKE001 2025-01-01 2025-12-31 transition:Category1

Kilele Highlands Beverages Ltd

Climate and Water Plan

Brewing and bottling with less water and less carbon

2025

Cover image

Document Information

Entity Name
Kilele Highlands Beverages Ltd
Entity Identifier
TRNFOODBEVERAGEKE001
Entity Identifier Scheme
http://standards.iso.org/iso/17442
Report currency
KES
Report period
2025-01-01 – 2025-12-31
Decimal separator
. (FULL STOP)
Report generated
2023-10-09 00:00:00 +0000

All disclosures are related to the reporting period above unless specified otherwise.

Introduction

This plan sets out how Kilele Highlands Beverages will reduce water withdrawal and emissions by 2028. It follows the Disclosure Framework. Kilele Highlands Beverages Ltd is a fictional company and every figure in this report is synthetic.

Table of contents

  1. 0 Document and entity information
  2. 1 Foundations
  3. 1.1, 2.1, 2.3, 4.3 Food & Beverage metrics
  4. 2 Implementation Strategy
  5. 3 Engagement Strategy
  6. 4.1, 4.2, 4.3 Metrics
  7. 4.1, 4.2, 4.3 Targets
  8. 4.3 GHG emissions and removals
  9. 5 Governance

0 Document and entity information ⮌

Kilele Highlands Beverages Ltd
Name of reporting entity The name of the entity whose transition plan this is. The entity's machine-readable identity is carried by the report's entity identifier, not by this concept; this exists so a standalone transition plan is attributable on its face, and it must agree with the identifier.
Cross-referenced from the general purpose financial reports
Transition plan reporting location Where these transition plan disclosures sit: within the entity's general purpose financial reports, in a standalone document alongside them, or in a standalone document that the general purpose financial reports cross-refer to. A single-value extensible enumeration.
2026-02-12
Transition plan publication date The date this version of the transition plan was published.

1 Foundations ⮌

Our nearest target is on water: reduce withdrawal in water-stressed basins from 1,150,000 m3 to 805,000 m3 by 2028. We have achieved 27.0%, with 1,056,850 m3 withdrawn.

Strategic Ambition The entity's overarching aims: its objectives and priorities for responding and contributing to the transition to a low-GHG, climate-resilient economy.
Up to the end of 2028, the period of our current business plan and budget.
Short-term definition How the entity defines short-term in the context of transition planning (DF 1.1.e). The Taskforce recommends short-term is defined as no longer than three years (DF footnote 24); an entity defining it as longer should explain why.
From 2029 to the end of 2035, the period covered by our crop and capacity planning.
Medium-term definition How the entity defines medium-term in the context of transition planning (DF 1.1.e).
Beyond 2035, up to the year of our long-term ambition.
Long-term definition How the entity defines long-term in the context of transition planning (DF 1.1.e).

We assume that rainfall in the Rift Valley becomes more variable, that borehole water levels continue to fall and that tea, barley and fruit yields hold only where irrigation becomes more efficient.

We depend on our growers in the Rift Valley highlands, on the Water Resources Authority's abstraction permits and on a reliable supply of barley; we assessed these by mapping each site and supplier by basin stress and testing the plan against a 30 percent cut in permits.

Key assumptions and external factors Key assumptions made and the external factors on which the entity depends to achieve the Strategic Ambition (matters such as policy and regulation, the decarbonisation of the economy, technology, data, demand, levels of warming, the physical impacts of the changing climate, and the effectiveness and limits of adaptation), their implications for achieving it, the timeframes over which they are expected to occur, and whether and how they are reflected in the financial statements.

1.1, 2.1, 2.3, 4.3 Food & Beverage metrics ⮌

By River basin and Metric identifier

2025
KE-RIFT-VALLEY / water-withdrawal-stressed-basins
River basin description Rift Valley lakes basin, central Kenya

2 Implementation Strategy ⮌

We plan KES 1.8 billion of capital expenditure for the transition plan over the five years 2026 to 2030, 27.0% of our planned capital expenditure over the same period, and KES 66 million for research and development of climate solutions. We resource the plan through a ring-fenced budget for rainwater harvesting, drip irrigation and biomass boilers, delivered by the sourcing and operations teams. We expect water and energy savings to cover about half the spend within five years; other effects on cash flow are not quantified because water permits and fuel prices are set externally.

Financial planning Effects of the transition plan on the entity's financial position, financial performance, cash flows and resourcing.
Ksh 1,800,000,000
Planned capital expenditure for the transition plan Capital expenditure the entity plans in order to implement its transition plan, over the period of the fact (the planning horizon it states).
Reporting period: 2026-01-01 – 2030-12-31
27.00 %
Planned capital expenditure for the transition plan, as a share of total planned capital expenditure The planned capital expenditure for the transition plan as a proportion of all capital expenditure the entity plans over the same period.
Reporting period: 2026-01-01 – 2030-12-31
Ksh 66,000,000
Planned investment in research and development for climate solutions Investment the entity plans in research and development for climate solutions as part of its transition plan, over the period of the fact.
Reporting period: 2026-01-01 – 2030-12-31

3 Engagement Strategy ⮌

We work with tea, barley and fruit growers in the Rift Valley highlands.

  • Share irrigation data each season.
  • Fund rainwater harvesting and drip irrigation.
  • Link supplier contracts to water outcomes.
PriorityActionOwner
WaterRainwater harvestingSourcing
CarbonBiomass boilers and packaging redesignOperations
Engagement with value chain Engagement activities with other entities in the value chain to achieve the Strategic Ambition.

4.1, 4.2, 4.3 Metrics ⮌

By River basin and Metric identifier

2025
KE-RIFT-VALLEY / water-withdrawal-stressed-basins
m³
Metric description Water withdrawal in basins classified as water-stressed
Metric value, governance, business and operational 1,150,000.00
Metric unit description, governance, business and operational Cubic metres

4.1, 4.2, 4.3 Targets ⮌

By Target Category and Target Identifier

2025
Governance, engagement, business and operational / TGT-FB-01
Target metric, description Water withdrawal in water-stressed basins
Target objective

To reduce water withdrawal in water-stressed basins by 30%, from 1,150,000 m3 at 2025 to 805,000 m3 by 2028. It is both a mitigation and an adaptation target: it lowers our water use and our exposure to cuts in allocation in the basins where the risk of drought is highest.

Target scope, description

Water withdrawn at our own sites and by contracted growers in water-stressed basins of the Rift Valley highlands; basins that are not water-stressed are outside the target.

Target period end date 2028-12-31
Time horizon Short term
Target base period date 2025-12-31
Target milestone, description

Interim milestone: no more than 1,040,000 m3 by 2026, a 10% reduction from 2025, on a straight-line path to the 2028 target of 805,000 m3.

Target type Absolute
Target base value, governance, business and operational 1,150,000 m³
Performance against target, governance, business and operational 1,056,850 m³
Percentage of target achieved 27.00 %
Target informed by the latest international climate agreement YES
International climate agreement, description The target responds to the Paris Agreement's call to build resilience to the physical effects of climate change, its adaptation goal, and supports the water-stress policies of Kenya.
Target validated by a third party NO
Target review process, description

The Board Sustainability Committee reviews progress quarterly and reviews the target itself once a year, when the annual report is approved. We re-baseline a target if acquisitions, disposals or changes in method move the base by more than 5%. The target and its methodology have not been validated by a third party.

Performance trend, description

Withdrawal stood at 1,056,850 m3 at the end of the period against 1,150,000 m3 at the base date, which is 27.0% of the way to the 2028 target. Progress came from rainwater harvesting at supplier farms in the Rift Valley and leak repairs at our two breweries.

Target value, governance, business and operational 805,000 m³
Target unit description, governance, business and operational Cubic metres withdrawn
Target progress monitoring metrics, description

We monitor the target measure from site and supplier records, the share of suppliers reporting each season, and progress against the milestone, reported to the committee each quarter. Progress is expressed as the share of the way from the base to the target, which stands at 27.0%.

4.3 GHG emissions and removals ⮌

24,500 tCO2e
Absolute gross GHG emissions, Scope 1 Absolute gross Scope 1 GHG emissions generated during the reporting period, expressed as metric tonnes of CO2 equivalent. Measured in accordance with the Greenhouse Gas Protocol: A Corporate Accounting and Reporting Standard (2004) unless a jurisdictional authority or exchange requires a different method.
9,800 tCO2e
Absolute gross GHG emissions, Scope 2 Absolute gross Scope 2 GHG emissions generated during the reporting period, expressed as metric tonnes of CO2 equivalent. Where the location-based or market-based measurement basis is specifically required, use the separately named concepts instead.

We measure Scope 1, 2 and 3 emissions under the GHG Protocol Corporate Standard (2004) and its Scope 3 Standard, setting the boundary by operational control. All seven Kyoto gases are included and converted to CO2e using IPCC AR6 100-year global warming potentials. Where growers do not report, agricultural emissions are estimated from crop, input and yield data. Emission factors come from Kenyan national emission factors. We made no change to the approach in the reporting period.

GHG measurement approach, description The measurement approach, inputs and assumptions used to measure GHG emissions, the reason for choosing them, and any changes made during the reporting period with the reasons for those changes. It states the standard used: the GHG Protocol Corporate Standard (2004), or the method a jurisdictional authority or exchange requires instead (4.3.l.ii).

By Accounting Consolidation

2025
tCO2e
Consolidated accounting group
Absolute gross GHG emissions, Scope 1 24,500

By Scope 3 Category

2025
tCO2e
Scope 3 Category 1
Absolute gross GHG emissions, Scope 3 388,000

5 Governance ⮌

The Board Sustainability Committee oversees the transition plan. It approves the targets, meets quarterly to review progress against them, and reports to the full board, which considers climate when it approves strategy, major investments and risk appetite, including sourcing, packaging and capacity decisions. The committee weighs the trade-off between near-term returns and the targets, and takes independent advice on scenarios and on its own training needs.

Board oversight and reporting The governance body or bodies, or individual or individuals, responsible for oversight of the transition plan.

The Operations Director is accountable to the Board Sustainability Committee for delivering the plan and chairs the Water and Carbon Working Group, which brings together Sourcing, Brewing, Packaging and Finance. Emissions and target data go through the same controls as our financial reporting, are reviewed by internal audit each year and are reported to the Board Sustainability Committee quarterly. Managers' climate objectives are part of their annual performance reviews.

Roles, responsibility and accountability Management's role in the governance processes, controls and procedures used to monitor, manage and oversee the transition plan.

4.0% of executive remuneration is linked to transition plan metrics, through an 8.0% weighting in the incentive plan.

Incentives and remuneration How incentive and remuneration structures align with the Strategic Ambition.
8.00 %
Percentage weighting of transition plan metrics in the executive incentive plan The typical percentage weighting of the transition plan-related metric(s) within the incentive plan for the executive population (DF 5.4.a.iii).
4.00 %
Percentage of executive remuneration linked to transition plan metrics The percentage of total executive remuneration that is linked to transition plan-related metric(s) (DF 5.4.a.iv).